Planning and Cost Assessment Guidelines for Making New Coal-Fired Power Generation Plants in Developing APEC Economies CO2 Capture-ready, March 2010

Published Under

SOM Steering Committee on Economic and Technical Cooperation (SCE), Energy Working Group (EWG)

Accessed

3325

Pages

79

 

This report describes the APEC project which aimed to develop guidelines for planning and cost assessment in relation to making future coal-fired plants in developing APEC economies ‘capture-ready’ as an aid to capacity building on carbon capture and storage in these economies.

 

1. Introduction
2. Carbon Dioxide Capture
3. Carbon Dioxide Transport and Storage
4. Capture-ready Concept for Coal-fired Power Plants
5. Capture-ready Plant Designs
6. Potential for Capture-ready Case Studies in Developing APEC Economies
7. Typical Coal-fired Plant
8. Planning Guidelines
9. Cost Assessment Guidelines
10. Additional Analyses Required
11. Summary and Conclusions